P. Mohan Rao Soni inspects road construction and maintenance projects, directs officials and contractors to follow prescribed standards
Published on: October 16 2026
By: BTNI
Location: Rajnandgaon, India
Superintending Engineer P. Mohan Rao Soni inspected various road construction and maintenance works in Rajnandgaon district on October 15 to review progress and ensure quality under the Pradhan Mantri Gram Sadak Yojana (PMGSY) and other rural infrastructure schemes.
During the inspection, he assessed the progress and quality of ongoing projects and instructed the concerned officials and construction agencies to adhere to prescribed technical standards and complete all works within the stipulated time frame.
PMGSY Phase IV Road Construction Reviewed
Soni inspected roads under construction under PMGSY Phase IV and reviewed the quality of the ongoing work. He directed the officials and implementing agencies to give special attention to the prescribed quality standards and ensure that construction meets the required specifications.
He emphasised the importance of maintaining construction quality while completing projects within the approved schedule.
Maintenance of Existing Roads Inspected
The Superintending Engineer also inspected maintenance work being carried out on roads constructed under PMGSY during the Defect Liability Period (DLP).

Reviewing the progress of maintenance activities, he instructed the concerned agencies to complete the necessary repairs and maintenance within the stipulated period. The inspection focused on ensuring that required maintenance work was undertaken in accordance with the applicable provisions.
Instructions for CC Roads and Drains Under Mukhyamantri Gram Gaurav Path Yojana
Soni also inspected ongoing cement concrete (CC) road and drain construction works under the Mukhyamantri Gram Gaurav Path Yojana.
He directed the officials and construction agencies to maintain quality and ensure compliance with the prescribed construction standards. Considering the presence of black soil along the route, he instructed the concerned teams to incorporate the necessary construction provisions suited to the site conditions.
He further stressed that all works should be completed within the stipulated time frame while maintaining the required standards.
Focus on Quality and Timely Execution
The inspection covered new road construction, maintenance of existing roads and CC road and drain projects. The directions issued during the visit underscored the importance of technical compliance, appropriate construction practices and timely completion of rural infrastructure works in Rajnandgaon district.
ALSO READ-
- New Industrial Push in Chhattisgarh to Generate 3,500 Jobs, Yash Fans Plant to Boost Manufacturing
- Jubin Nautiyal Sets Rajnandgaon Ablaze with Music as Dr Raman Singh Celebrates His Birthday
- PMGSY Road Works in Rajnandgaon: Superintending Engineer Stresses Quality and Timely Completion
- Floriculture Hub Incentive Scheme Boosts Flower Cultivation in Rajnandgaon
- Rajgami Estate to Undergo Three-Year Audit, Transparency to Be a Priority: Manoj Nirvani



